We've moved - And we love our new location!!

(Visit our Facebook page and look for this story if you'd like to post a comment about the new place!)

It's only been two years since Stamp-n-Storage moved out of Brett's 600 sq ft garage into what was then a VAST 2000 sq ft shop.  

A smiling man in a red sweater stands in front of a gray metal building with a large roll-up door and a colorful "Stamp-n-Storage" sign.

There was room to spare.  He was asking himself, "What will I do with all this space??!!"

Panoramic view of the empty shop: bare concrete floor, white walls, a garage door, a small window, and wooden stair railings.

It started filling up quickly, and in the fall of 2012 the production area was taking shape.  

Open workshop with a Stamp-n-Storage sign, workbenches, a table saw, a cart of wood pieces, and stacked panels, with no one present.

Fast forward two years. Things have been re-arranged a couple of times and it's no longer just Brett working in the shop; there are now five other full-time employees that are sharing the space. The space is FULL.  

Crowded workshop seen from above, with lumber stacks, a tall shelf of wood panels, a table saw, planer, and bins of parts.

Two people were sharing the only office. The bathroom held the fridge and microwave. The shipping room was packed to the roof with no room to add new products. It was time to move and find a new home for Stamp-n-Storage.  

There weren't many options available that were a good fit for us and our first choice fell through at the last minute.  But we found a space that was a diamond in the rough.  (Yes, all the lights ARE on...)  This is how it looked in early August.

Dim, unfinished warehouse seen from above, filled with plastic-wrapped furniture, cardboard boxes, and stacked lumber on a bare concrete floor.

Unfinished warehouse seen from above, with large gray ductwork across the concrete floor, green pallet racks, scissor lifts and a stepladder.

It has been a BUSY two months for us and for the contractors.  New lights were installed, and construction began on the offices (the space under the duct work and behind the two big green sliding doors became the offices).

Empty warehouse with bare concrete floor, green doors, exposed ductwork and a few scattered boards and equipment before renovation.

The space was completely cleaned out to prepare for the floor coating.  

Empty warehouse before renovation, with bare concrete floor, a red-painted patch, steel columns, and open doorways along the back wall.

Empty warehouse with bare concrete floor, a white-walled office frame under ductwork, and a green door on the left.

In the picture above the offices have been roughed in.  The day after these pictures were taken, work began on the floor.  It really transformed the space!

Wide, empty warehouse with a freshly coated glossy light gray floor, red support posts, and roughed-in offices along the back wall.

Wide shop floor with fresh glossy gray coating, newly framed office walls on the left, and exposed ductwork overhead.

It was starting to come together!  MUCH more work was done, and the move-in date arrived.  The last two weeks have been insanely busy with final details and getting the shop set up and running, but we've made it.  

Wide view of a large workshop with a fresh gray floor, sawhorses, lumber and wood shelving frames, and one person in the back.

Wide view of a clean, empty shop with a white floor, roughed-in offices at back, and racks of wood panels at right.

An inventory room and mezzanine was added to the far end of the shop (background for the above picture).  This lets us keep all your goodies out of the dust!  And the mezzanine space above is our break area - the fridge and microwave came out of the bathroom!

A man lifts a cardboard box inside the new white-walled inventory room, with stacked boxes nearby and the mezzanine stairs outside.

Inventory room with tall stacks of cut wood-fiber boards on a gray floor and shelves of cardboard boxes along the left wall.

The transformation from a dark storage warehouse to a bright and lively workshop is complete, and the new offices are great.  It's nearly 8,000 square feet of space, and we're ready to grow some more!

Before and after pictures below show the transformation from the two ends of the space:

Before view of the empty warehouse: long unfinished stud walls with exposed framing, a bare concrete floor and ductwork overhead.

Panoramic view of a new office: a woman works at a curved wood desk, with a sorting cabinet and a long hallway beside her.

Before view of the empty warehouse: bare wall studs, hanging duct units, a concrete floor and a cinder block wall at the far end.

Panoramic view of an empty-looking new office with tan walls, gray carpet, a corner cherry wood desk, a bookcase and a window.

Here we all are with our first product built in the new space.  From the left:  Jackson, Pete, Bryan, Julie, Leo and Brett.

Six team members stand in a large, empty workshop, one holding a flat wooden panel with a lattice pattern.

We're loving it here.  We each have our own area to work, and there's ROOM to spread out.

Now ... what are we going to do with all this space?